Contract Amount: $3,500,000.00

The Virginia Water Treatment Plant project consists of the construction of a new 1.44 MGD water treatment plant.

Included in the project:

  • A new concrete and masonry treatment building
  • Earthwork
  • Lime stabilization
  • Concrete
  • Gravel and bituminous driveways
  • Concrete footings and foundations
  • Concrete floors
  • Precast concrete planks and double tees
  • Up flow solids contact clarifier
  • Aerator/head tank
  • Ground storage tank
  • Re-carbonation vessel
  • Filtrations units
  • Lime storage and feeding system
  • Chemical feed and storage systems
  • Backwash lagoons
  • Pumps
  • Process piping systems
  • Electric power distribution
  • Instrumentation and controls
  • Painting and coatings
  • Wells
  • Elevated water storage tank