Contract Amount: $3,500,000.00
The Virginia Water Treatment Plant project consists of the construction of a new 1.44 MGD water treatment plant.
Included in the project:
- A new concrete and masonry treatment building
- Earthwork
- Lime stabilization
- Concrete
- Gravel and bituminous driveways
- Concrete footings and foundations
- Concrete floors
- Precast concrete planks and double tees
- Up flow solids contact clarifier
- Aerator/head tank
- Ground storage tank
- Re-carbonation vessel
- Filtrations units
- Lime storage and feeding system
- Chemical feed and storage systems
- Backwash lagoons
- Pumps
- Process piping systems
- Electric power distribution
- Instrumentation and controls
- Painting and coatings
- Wells
- Elevated water storage tank