Water Treatment and Storage Improvements

Hoopeston, IL

 

 

Quick Facts:

Owner: City of Hoopeston
Engineer: Foth Infrastructure & Enviromental, LLC
Cost: $2,048,400.00
Superintendent: Barry Reed
Project Manager: Barry Reed

Project Consists of refurbishing existing 150,000 gallon elevated water tower including surface prepararion and coating of exterior and interior surfaces, new cathodic protection system, tank cleaning and removal and disposal of settled solids, various tank repairs, and structural upgrades and portable hydro-pneumatic tank systems; refurbishing of existing 500,000 gallon ground storage tank including surface preparation and coating of exterior and interior surfaces, new cathodic protection system, tank cleaning and removal and disposal of settled solids, various tank repairs and structural upgrades, new valve vault, site piping, valves and appurtenances; new package aeration treatment unit including new package aeration treatment unit new concrete base slab ad foudation; electrical, controlsm and instrumentation; and site clean-up, finish grading and surface restoration.