Contract Amount: $11,415,337.00

The Mt. Carroll Wastewater Treatment Facility (WWTF) project provided a new WWTF that includes the following:

  • New Headworks Building
  • Aeromod Activated Sludge System
  • UV Disinfection Building and System
  • Architectural Pre-Cast buildings containing screenings removal, grit removal systems, Sludge Dewatering System, Aeration Blowers, and Influent Pumping Systems
  • Concrete Flow Equalization Tank
  • Existing Center Street Lift Station improvements
  • Demolition of existing wastewater treatment facility