Contract Amount: $11,415,337.00
The Mt. Carroll Wastewater Treatment Facility (WWTF) project provided a new WWTF that includes the following:
- New Headworks Building
- Aeromod Activated Sludge System
- UV Disinfection Building and System
- Architectural Pre-Cast buildings containing screenings removal, grit removal systems, Sludge Dewatering System, Aeration Blowers, and Influent Pumping Systems
- Concrete Flow Equalization Tank
- Existing Center Street Lift Station improvements
- Demolition of existing wastewater treatment facility