Contract Amount: $8,165,769.00

The Eldridge Water Treatment Plant project consists of the improvements to the existing WWTP that included:

  • New Sludge Storage Building
  • Conversion of a Sludge Storage tank into a Aerobic Digestor with an Extruded Aluminum Cover
  • 4 New Sequenced Batch Reactors (SBR) systems
  •  Improvements to the UV Channels including new UV Equipment
  • New Shaftless Screw Conveyor
  • New Polymer Feed System
  • New Belt Filter Press
  • New Tension Fabric Structure
  • New Paving and site improvements