Contract Amount: $8,165,769.00
The Eldridge Water Treatment Plant project consists of the improvements to the existing WWTP that included:
- New Sludge Storage Building
- Conversion of a Sludge Storage tank into a Aerobic Digestor with an Extruded Aluminum Cover
- 4 New Sequenced Batch Reactors (SBR) systems
- Improvements to the UV Channels including new UV Equipment
- New Shaftless Screw Conveyor
- New Polymer Feed System
- New Belt Filter Press
- New Tension Fabric Structure
- New Paving and site improvements