• Call us today - (309) 647-7400

University Union Renovations

Western IL University,

Macomb, IL

 

Quick Facts:

Owner: Western Illinois University
Engineer: FGM Architects, Inc
Cost: $2,113,900.00
Superintendent: Ross Hodgson
Project Manager: Barry Reed

The project consists of renovation of basement level, ground floor, first floor, site work and a building addition including selective demolition, site utilities, site improvements, interior renovations consisting of gypsum board, acoustical ceilings and linear metal ceilings, terrazzo flooring, resilient flooring, tile carpeting, millwork, carpentry, hollow metal doors, and frames, wood doors, door hardware, overhead coiling doors, interior painiting, roller window shades, and entrance floor mats and frames, building addition consisting of cast-inplace concrete, masonry, structural precast concrete, structural steel, metal fabrications, stainless steel pipe and tube railings, waterproofing, composite wall panels, sheet metal flashings and trim, contractors include fire suppression, plumbing, heating, ventilating and air conditioning, and electrical.