Combined Sewer Overflow (CSO) Long Term Control Plan Improvements Phase 3B and 4

Pekin, IL

 

 

Quick Facts:

Owner:City of Pekin
Engineer: Farnsworth Group
Cost: $2,639,031.00
Superintendent: Clint Sorrells
Project Manager: Bobby Asbury

The project consists of manhole lining including installing new manhole frames and covers, sewer lining, control and instrumentation including antenna tower and stainless steel junction box at CSO Pump Station. Phase 4 includes refurbishing of existing Sludge Storage Lagoon by clearing of existing emergent vegetation, trees, roots, shrubs, repairing and re-grading berms, bentonite stabilizing of lagoon bottom and berms, re-compacting and seeding. Demolition and conversion work for north and south aerated detention tanks including installing aerated piping and diffusers, concrete work, painting, etc. Process piping, valves, fittings, sitting of equipment, etc. Electrical work including controls and instrumentation.