Water Pollution Control Plant Improvements

Keokuk, IA

 

 

Quick Facts:

Owner:City of Keokuk
Engineer: Veenstra & Kimm, Inc
Cost: $4,597,401.00
Superintendent: Jerry Davis
Project Manager: Megan Smith

Project consists of water pollution control plant improvements including excavation, backfill and site work, demolition, reinforced concrete, masonry building work including plumbing, HVAC, doors, windows, terrazzo flooring, painting, etc., process painting, miscellaneous metal fabrication, by-pass pumping, equipment consisting of aeration equipment, screening equipment, ultraviolet disinfection equipment, pumping equipment, slide and stop gates, trough covers at clarifiers, etc. electrical work including conduit cables, wiring, motor controls, starters, switches, fixtures, controls, generator and switch gear, etc. Piping and appurtenances consisting of site work, process piping, valves, fittings, setting of equipment, etc. Miscellaneous associated work including clean-up.