Galesburg High School Phase One Improvements

Galesburg Public Schools, Galesburg, IL

 

Quick Facts:

Owner: Galesburg CUSD 205
Architect: Dewberry Architects, Inc
Cost: $3,402,520.00
Superintendent: Rick Roberts
Project Manager: Bobby Asbury

Project consists of Bid Package No. 5 entitled Steel Fabrication and Erection, Bid Package No. 6 entitled General Carpentry, Bid package No. 12 entitled Painting, and Bid Package No 24 entitled Sitework including fabrication and erection of structural steel framing, steel joist framing, steel decking, metal fabrication, metal stairs and metal grating; general carpentry consisting of cold formed metal framing, miscellaneous rough carpentry, sheathing, exterior finish carpentry, interior architectural woodwoork, plastic paneling, thermal insulation, EIFS, fluid applied membrane barriers, fiber cement siding, plastic siding, joint sealants, hollow metal doors and frames, access doors and frames, vinyl windows, door hardware, non-structural metal framing, gypsum board, acoustical panel ceilings, resilient base and accessories, vinyl composite tile flooring, visual display surfaces, signage, toilet compartments, toilet and bath accessories, fire extinguisher cabinets, metal lockers, projection mounts, metal countertops and pre-engineered building systems; sitework consisting of tree and plant protection, temporary erosion and sediment control, structure demolition, selective structure demolition, facility water distribution piping, facility sanitary sewers, earth moving, asphalt paving, concrete paving, tree protection and trimming, storm utility drainage piping and subdrainage.

LIVE WEB CAM http://50.200.60.143