Water Treatment Plant Improvements

Village of Chapin, IL

 

 

Quick Facts:

Owner: Village of Chapin
Engineer: Benton & Associates.
Cost: $2,033,000.00
Superintendent: Dan Westlake
Project Manager: John Schultz

Project consists of a pre-engineered metal building addition and existing building rehabilitation, concrete work, precast concrete structures, site work and miscellaneous construction, emergency interconnect pipeline and appurtenances, membrane filtration system, vertical pressure filter system, raw water pumps, chemical feed system and appurtenances, testing equipment, building drains and sanitary sewer connections, interior and exterior piping and connections, HVAC System, electrical and standby generator, SCADA system and painting and coatings.

The water treatment palnt must provide continuous treatment capacity during the construction period making this project coordination extremely critical. The project also uses both a pressure filter systtem and a membrane filtration system for water purification which is very unusual.